A bridge connecting Baghdad to another province blocked for 45 days

A bridge connecting Baghdad to another province blocked for 45 days
2020-02-09T08:26:55+00:00

Shafaq News / The General Traffic Directorate announced on Sunday blocking the power bridge that connects the capital, Baghdad and Wasit Governorate for a month and a half.

The directorate said in a statement today that "the energy bridge going from Baghdad to Wasit will be blocked for a period of 45 days for the purpose of repairing the damages in it."

Shafaq Live
Shafaq Live
Radio radio icon